Forge Nano’s gigafactory groundbreaking took place on August 19, 2026 in Morrisville, North Carolina, USA. Forge Nano held a groundbreaking ceremony for the expansion of a lithium-ion battery manufacturing facility, attended by a North Carolina senator, a congressional representative, the mayor of Morrisville, and a Department of Energy (DOE) deputy assistant secretary.

Key News Facts
- Expansion scale: approx. 3GWh/year, equivalent to roughly 150 million battery cells/year
- Expands the existing 100,000-square-foot facility to more than 3x its size
- Job creation: 250+ positions
- Funding: up to USD 100 million in non-dilutive funding from the US Department of Energy (DOE)
- Partnership: Samsung SDI provides operating/manufacturing know-how, with a conditional purchase agreement for cells produced at this plant starting in 2028
- Purpose: reducing overseas supply-chain dependence for batteries used in defense-related applications
Qualitative language (“innovative,” “game-changer,” etc.) from the original press release has been excluded from this summary as promotional rhetoric. All items above retain only the figures and facts stated in the primary announcement materials.
Mechanical-Design Impact Analysis
In absolute terms, the 3GWh/year expansion is smaller than large Chinese or Korean gigafactories (single-line 10GWh-class). However, the fact that it expands the existing site to more than 3x its size is significant from a mechanical-design standpoint. Adding new lines on top of an existing building’s frame and foundation load conditions makes floor flatness and foundation-settlement management more demanding than new construction. Roll-to-roll coating/calendering lines experience web wandering once horizontal precision deviates beyond ±0.5mm, so a separate leveling-foundation construction step must precede any expansion on an existing slab. Because Samsung SDI is providing operating/manufacturing know-how, equipment standards (equipment-layout pitch, utility inlet locations) are also likely to be transferred, meaning domestic equipment makers will need to respond to spec-sheet conformity when future equipment orders are placed.
Spec Comparison Table
| Item | Forge Nano (NC, USA) | Notes |
|---|---|---|
| Expansion scale | Approx. 3GWh/year | Expands existing 100,000ft² facility more than 3x |
| Employment | 250+ jobs | Per initial announcement |
| Funding | DOE, up to USD 100 million | Non-dilutive funding |
| Partner | Samsung SDI | Provides operating/manufacturing know-how; conditional purchase agreement for 2028 |
| Application | Defense supply-chain lithium-ion cells | Chemistry/capacity specs (undisclosed) |
One-Line Summary
The key point of Forge Nano’s 3GWh expansion is not its scale but the construction condition of expanding the existing site by more than 3x — foundation leveling will govern roll-to-roll line yield.